STMicroelectronics · Other integrated circuits
LF120ABV
IC REG LIN 12V 500MA 5PENTAWATT
STM32-first sourcing with STMicroelectronics support components. Review recorded cores, flash, RAM, connectivity and package facts before moving an approved design into production.
Request this exact part →LF120ABV specifications
Recorded source facts. Missing values are kept explicit; verify the exact manufacturer document before design approval.
| Manufacturer | STMicroelectronics |
|---|---|
| Ordering code | LF120ABV |
| Family | Other integrated circuits |
| Package | Pentawatt-5 (Vertical, Bent and Staggered Leads) |
| Product Status | Obsolete |
| Output Configuration | Positive |
| Output Type | Fixed |
| Number of Regulators | 1 |
| Voltage - Input (Max) | 16V |
| Voltage - Output (Min/Fixed) | 12V |
| Voltage - Output (Max) | Not provided in source |
| Voltage Dropout (Max) | 0.7V @ 500mA |
| Current - Output | 500mA |
| Current - Quiescent (Iq) | 1.5 mA |
| Current - Supply (Max) | 12 mA |
| PSRR | 69dB ~ 54dB (120Hz ~ 10kHz) |
| Control Features | Not provided in source |
| Protection Features | Over Current, Over Temperature |
| Operating Temperature | -40°C ~ 125°C |
| Mounting Type | Through Hole |
| Package / Case | Pentawatt-5 (Vertical, Bent and Staggered Leads) |
| Supplier Device Package | 5-PENTAWATT |
Documents and evidence
LF120ABV ↗Catalog sources
www.ic-components.com · LF120ABV ↗Source directory identity match; source detail pending. Specifications remain from existing catalog.
Before sourcing LF120ABV
- Identify the firmware and board baseline
- Check flash, RAM and required peripherals
- Review pin assignment and supply limits
- Keep the full temperature and package suffix
Questions about LF120ABV
How do I request a current price?
Provide this full code, quantity, destination and arrival date. Budget estimates are conditional; final availability and price are confirmed by quotation.
Can a related record replace this device?
Related records aid discovery. Package, pinout, ratings, tooling and software require engineering approval before substitution.