STMicroelectronics · Discrete semiconductors
STGD25N40LZAG
POWER TRANSISTORS
STM32-first sourcing with STMicroelectronics support components. Review recorded cores, flash, RAM, connectivity and package facts before moving an approved design into production.
Request this exact part →STGD25N40LZAG specifications
Recorded source facts. Missing values are kept explicit; verify the exact manufacturer document before design approval.
| Manufacturer | STMicroelectronics |
|---|---|
| Ordering code | STGD25N40LZAG |
| Family | Discrete semiconductors |
| Package | TO-252-3, DPak (2 Leads + Tab), SC-63 |
| Product Status | Active |
| IGBT Type | Not provided in source |
| Voltage - Collector Emitter Breakdown (Max) | 435 V |
| Current - Collector (Ic) (Max) | 25 A |
| Current - Collector Pulsed (Icm) | 50 A |
| Vce(on) (Max) @ Vge, Ic | 1.25V @ 4V, 6A |
| Power - Max | 125 W |
| Switching Energy | Not provided in source |
| Input Type | Logic |
| Gate Charge | 26 nC |
| Td (on/off) @ 25°C | 1.1µs/4.6µs |
| Test Condition | 300V, 10A, 1kOhm, 5V |
| Reverse Recovery Time (trr) | Not provided in source |
| Operating Temperature | -55°C ~ 175°C (TJ) |
| Mounting Type | Surface Mount |
| Package / Case | TO-252-3, DPak (2 Leads + Tab), SC-63 |
| Supplier Device Package | D-PAK (TO-252) |
Documents and evidence
STGD25N40LZAG ↗Catalog sources
www.ic-components.com · STGD25N40LZAG ↗Source directory identity match; source detail pending. Specifications remain from existing catalog.
Before sourcing STGD25N40LZAG
- Identify the firmware and board baseline
- Check flash, RAM and required peripherals
- Review pin assignment and supply limits
- Keep the full temperature and package suffix
Questions about STGD25N40LZAG
How do I request a current price?
Provide this full code, quantity, destination and arrival date. Budget estimates are conditional; final availability and price are confirmed by quotation.
Can a related record replace this device?
Related records aid discovery. Package, pinout, ratings, tooling and software require engineering approval before substitution.